Wells
Manuals
The Well Permit Application Manual guides industry through the well permit application process and requirements.
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | May 2013 | Added clarification to the definition of a UTM Zone, under Block L (p.36). |
Guidelines
The Flaring and Venting Reduction Guideline guides industry through the best practices for flaring, incinerating and venting gas at a facility.
| Version Date | Effective Date | Update |
|---|---|---|
February 2013 | March 2013 | Updated Limitations of Venting Gas Containing H2S or Other Odorous Compounds section to include a ppm amount (p.54). |
The Well Completion, Maintenance & Abandonment Guideline guides industry through the best practices for completions, workovers, suspensions and abandonments of wells, including electronic submissions for hydraulic fracturing.
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | June 2013 | Updated section 6.1 to include changes to the Completion / Workover Report Form for the purpose of electronic submission of hydraulic Fracture data (INDB 2013-03). |
The Well Drilling Guideline guides industry through the best practices for drilling and operating a well.
Forms
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | June 2013 | Updated form to include data for electronic submissions. |
The Engineering Data Sheet for Re-Entry must be submitted with an application to re-enter a well.
The Notice of Well Construction Starts is used by permit holders to notify the Commission of well construction. It must be submitted 48 hours before construction begins.
The Subsequent Well Application Form (with no new area) is used by permit holders to apply for a subsequent well with no new area either after the primary well has been applied for or with a multi-well package.
| Version Date | Effective Date | Update |
|---|---|---|
December 2012 | December 2012 | Removed the ePASS No. from Block C. |
The Surface Casing Vent Flow-Gas Migration Information Form is used by permit holders to report the surface casing vent flow and gas migration for a well.
The Well Permit Amendment Application Form is used by permit holders to apply for an amendment to a well permit.
The Well Permit Application Form is used by applicants to apply for a well permit.
The Well Suspension/Inspection Form is used by permit holders to notify the Commission of suspended well activity.
Additional Information
The Hydraulic Fracturing Electronic Submission - User Guide is intended to guide users through the processes for submitting hydraulic fracturing data electronically.
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | June 2013 | New document posted to the website. Users are encouraged to review the document in full. |
The Hydraulic Fracturing Electronic Submission - Frac Submission Template provides users with the exact format required for creating a .csv file to upload electronic Hydraulic Fracture Data.
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | June 2013 | New document posted to the website. Users are encouraged to review the document in full. |
The Hydraulic Fracturing Electronic Submission - Perf Submission Template provides users with the exact format required for creating a .csv file to upload electronic Perforation Interval Data when fracturing occurs in cased wells.
| Version Date | Effective Date | Update |
|---|---|---|
April 2013 | June 2013 | New document posted to the website. Users are encouraged to review the document in full. |
Formerly the Completion/Workover Report Guideline, this document is intended to provide a quick-reference list of activities that do require the submission of a Completion / Workover Report, and those that do not.
| Version Date | Effective Date | Update |
|---|---|---|
May 2013 | June 2013 | Added, well inspection of the suspension, to the maintenance side of the document. |